All,<div><br></div><div>Here&#39;s a quick list of what I&#39;m planning to have shipped, by destination room:</div><div><br></div><div>MDF:</div><div> 2 3750 switches</div><div> 2 3560 switches</div><div><br></div><div>IDF1:</div>
<div> 2 3560 switches</div><div><br></div><div>IDF2:</div><div> 2 3560 switches</div><div><br></div><div>NOC</div><div> 1 3560 switch</div><div><br></div><div>Cafe</div><div> 1 3560 switch</div><div><br></div><div>To be allocated to a location on site:</div>
<div> 73 1252 AP&#39;s</div><div> 37 Port Injectors for the AP&#39;s</div><div> 7 3560-8 port switches</div><div><br></div><div>Also, we need one switch with two copper gig ports to span the distance to the cafe. Seems silly to allocate a large 3560 for this purpose, and the 8-ports only have 1 gig...<br clear="all">
<br></div><div>Enjoy!</div><div>Chris.</div><div><br>-- <br>Chris Elliott<br><a href="mailto:chelliot@pobox.com">chelliot@pobox.com</a><br><br>
</div>