<html><head></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><br><div><div>On Jun 29, 2010, at 8:03 AM, Chris Elliott wrote:</div><br class="Apple-interchange-newline"><blockquote type="cite">All,<div><br></div><div>Please read ASAP. This needs to go to Verilan this afternoon.</div><div><br></div><div>After talking with Chris with Verilan and going over the facility with Geert, I've come up with the following list of equipment and supplies:</div>
<div><br></div><div>Equipment:</div><div>4 48-port 3750-G's. Two in the MDF/SER1, one for the NOC, and one spare. There's also 2 24-ports, but I don't think we need them. Won't power the 1252 AP's to full power.</div>
<div>8 24-port 3560-E's. Two will go in the MDF/SER1, two in the IDF/SER2, one in the IDF/SER3, one for the Auditoriums, and one for SER7, depending on how that works out. And a spare. Will power the 1252's to full power.</div>
<div>17 8-port 3560's. These are 10/100, with one gig port. PoE, but will not power the 1252 AP's fully. Fanless, so silent. Do we want all 17? Easy to ship, so I'm thinking ship them all.</div></blockquote><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>Use them as fill. Ship at least 8-10, and then whatever can fit in the remaining space in the box.</div><br><blockquote type="cite"><div>75 1252 AP's with dual .11N radios covering 2.4 and 5Ghz. This includes the one I've had that's mildly defective and needs it's Ethernet cable taped in.</div>
<div>37 Power Injectors for the above AP's. This will allow us to power the 1252's off of the 8-port 3560's or the 3750's.</div><div><br></div><div>The one thing we will need is a small switch with 2 gig ports for the mid-span to the cafe. I'll ask Verilan if they have something we can borrow.</div></blockquote><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>Worst case, I grab one of my spares or go to Fry's.</div><br><blockquote type="cite">
<div><br></div><div>Fiber patch cables:</div><div>12 5-meter 62.5 multimode w/ SC connectors for the MDF/SER1. Because of where the rack is we need longer jumpers here. 3 meter may work, but it would be tight.</div><div>10 2-meter same for the IDF connections, etc.</div>
<div>8 1-meter same for switch-switch/patch-patch.</div></blockquote><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>Is this assuming single or dual connections from the IDF switches to the core? If we can do it, LAGing to both elements of the core would be great.</div><div><br></div><br><blockquote type="cite"><div><br></div><div>Copper patch cables:</div><div>Here's what Verilan shipped to Stockholm:</div><div>8 100 foot</div><div>20 75 foot</div><div>20 50 foot</div>
<div>10 35 foot</div><div>22 25 foot</div><div>50 14 foot</div><div>20 10 foot</div><div>70 7 foot</div><div>40 3 foot</div><div><br></div><div>I think this will do us, except it appears that we will need some longer cables for the Auditoriums, unless we allocate two switches, one for each Auditorium, instead of centrally locating one switch. I'll ask Verilan if they have some longer ones. I hear certain people on the team are cable terminators extraordinaire... :-)</div>
<div><br></div><div>Power cords:</div><div>One for each switch and power injector (66), plus a few spare:</div><div>70 euro power cords</div><div><br></div><div>Anything else?</div></blockquote><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>All sounds good. </div><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>In an unrelated note, we should think about Speakers for the NOC. We'll need tunes...</div><div><br></div><div><span class="Apple-tab-span" style="white-space:pre">        </span>- Jim</div><div><br></div><div><br></div><br><blockquote type="cite"><div><br></div><div>Chris.</div><div><br>
</div><div><br><div class="gmail_quote">On Mon, Jun 28, 2010 at 11:58 AM, Chris Elliott <span dir="ltr"><<a href="mailto:chelliot@pobox.com">chelliot@pobox.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
All,<div><br></div><div>Here's a quick list of what I'm planning to have shipped, by destination room:</div><div><br></div><div>MDF:</div><div> 2 3750 switches</div><div> 2 3560 switches</div><div><br></div><div>IDF1:</div>
<div> 2 3560 switches</div><div><br></div><div>IDF2:</div><div> 2 3560 switches</div><div><br></div><div>NOC</div><div> 1 3560 switch</div><div><br></div><div>Cafe</div><div> 1 3560 switch</div><div><br></div><div>To be allocated to a location on site:</div>
<div> 73 1252 AP's</div><div> 37 Port Injectors for the AP's</div><div> 7 3560-8 port switches</div><div><br></div><div>Also, we need one switch with two copper gig ports to span the distance to the cafe. Seems silly to allocate a large 3560 for this purpose, and the 8-ports only have 1 gig...<br clear="all">
<br></div><div>Enjoy!</div><div>Chris.</div><div><div></div><div class="h5"><div><br>-- <br>Chris Elliott<br><a href="mailto:chelliot@pobox.com" target="_blank">chelliot@pobox.com</a><br><br>
</div>
</div></div></blockquote></div><br><br clear="all"><br>-- <br>Chris Elliott<br><a href="mailto:chelliot@pobox.com">chelliot@pobox.com</a><br><br>
</div>
_______________________________________________<br>ietf78-tech mailing list<br><a href="mailto:ietf78-tech@daedelus.com">ietf78-tech@daedelus.com</a><br><a href="http://www.daedelus.com/mailman/listinfo/ietf78-tech">http://www.daedelus.com/mailman/listinfo/ietf78-tech</a><br></blockquote></div><br></body></html>