[ietf85-tech] Minutes 2012-10-19 (T-Shirt?)
Bjoern A. Zeeb
bzeeb-lists at lists.zabbadoz.net
Fri Oct 19 13:30:21 PDT 2012
Hi,
we clearly need to submit the Photo from Taipei with the secretariat
in billo-shirts for http://www.ietf.org/meeting/gallery/gallery.py .
Ok, not entirely sure who all was on the call; if you are missing,
raise your hand.... the webex quality is better for barge in...
Take the fiber connections with a grain of salt .. anyway double-check
before trusting me on anything.
Attendees at least:
bz, warren, jim, chelliot, billo,
Rick and Nick
Tony
Jim: external
circuits in MDF, waiting for rolling rack to install the Cienna
+1 SM LC-LC patches, SC-LC (I think that was for the kit list)
Nick: can travel with some fiber
Jim: all (in) MDF will be LC; short hops MM; everything else
should be LC-LC; for routers to comcast
everything esle between switches copper
any questions for external? --- silence ---
TODO Nick, can you check the routers have the right interfaces?
Nick: get pictures
Jim: inside
+Nick+Rick: switches + additional babies from N.NOG (13 of them)
Jim: chelliot + Jim PSAV conversation
Chellio:
cutover on Friday; both meetings rooms (and guestrooms?)
one issue: IDF - we have only 1 cable, thus need to take over
IDF as soon as possible f. NOC, Wednesday?
Jim: wifi on POE, powerdown on their switches => no reconfiguration
clean walkthrough; charge sth but not a ton
Jim: meeting room ok, politics are sorted;
Just 1 rom to meeting rooms => lots of switch deployments
[ED. wonders while typing if we have enough patch cables, long ones
etc for this setup. I have not been onsite but I hope you guys
cross-checked]
Jim: guestrooms "holy hell" AT&T+legal, Hilton+legal, lots of
meetings
"all done"
they change al SSIDs f. HHoners; been worried
"we could steal their private guests infromation"
Clever guy: not that we could not have already
one more meeting: what ssid they change the rooms to (next wed)
onsite guys ok
1 VLAN wifi, 1 VLAN guestrooms (pvlans)
we could bridge or keep 2 VLANs
Servers?
Warren: 3 servers to arrive Oct 30th
+jim: they'll go with the kit
comcast another 3, going back to ISC
Warren/:shipping to hotel and we'll deal with them from there
Jim
bz: to carify: we'll setup the 3 comcast in ATL ready for ISC?
Jim: yes
Tony: jumpers/onterfaces/...
Jim: routers 10km optics
any issues on comcast side we should be aware of?
Tony: got a question for RIPE netblocks owned by ISOC
installation of cienna next week
Jim: arrivals Tue mostly; Wed-Fri morning crunch through
Tony: BGP up on Wed, at least links?
Rick: Nick + Lance to arrive on Monday
Jim: Tony transit networks for ptp links missing
TODO
Tony: working on this
[ Warren and Rick a bit on the ICANNot network ]
billo: The billo question!?
Jim: "we need to be a virtual billo", rancid ,...
crowd voets beecee to be the person
wej could do it
Jim: we get more redundancy and less wej overflow if bz helps
Ok one more call next friday
[ED: I wonder what's the teardown schedule for Atlanta? Anything
runnign on the Saturday afterwards? Anyone around for the weekend? ]
--
Bjoern A. Zeeb You have to have visions!
Stop bit received. Insert coin for new address family.
More information about the ietf85-tech
mailing list